Before your visit
Getting ready for your EPC.
There's nothing to clean or tidy. A few minutes finding paperwork can make a real difference to your rating, though.
What happens on the day
The visit usually takes 30 to 45 minutes. I'll go into every room and take measurements, look at the heating system and controls, check the windows, look into the loft if there's a hatch, and take photos as evidence for the certificate. Someone just needs to be there to let me in.
Paperwork that can improve your rating
If I can't see something or prove it, I have to use default assumptions, and they're usually pessimistic. Have these to hand if you've got them:
- Cavity wall or external wall insulation: the guarantee or installer's certificate.
- Loft insulation in a loft you can't easily get into: an invoice or certificate showing the depth.
- Extensions and loft conversions: the building control completion certificate, with the year it was built.
- Windows: a FENSA or CERTASS certificate, which shows the date they were fitted.
- Solar panels or a heat pump: the MCS certificate.
- Boiler: the make and model are usually on the boiler itself, so just make sure I can get to it.
Access checklist
- Clear access to the loft hatch, if you have one.
- The boiler and hot water cylinder easy to get to.
- Locked rooms unlocked, and the tenant told about the visit if the home is let.
After the visit
Your certificate is lodged on the national register and emailed to you within 48 hours, as long as I don't need any extra information. It lists recommended improvements and their likely effect on your rating.